Alle Ausschreibungen
Frist beendetRef. UH-2022-104

Cable Qualification System for use by Vattenfall Eldistribution AB

Auftraggeber

Vattenfall Eldistribution AB

Österreich

Veröffentlicht

08. Mai 2023

beobachtet 10.09.2026, 04:35

Angebotsfrist

Angabe aus der offiziellen Publikation

Leistungsgegenstand

Worum geht es?

INVITATIONThis Cable Qualification System´s (QS) aim is to prequalify manufacturers(s) to Vattenfall Eldistribution AB of 12- 170 kV power cables and lines accordingto Vattenfall´s technical specifications and other requirements.The qualification concern specific production site(s), even if some questions might be on company level - the questionnaire is indicating which part. This prequalification system is also announced in TED (Tenders Electronic Daily) and turns to all interested manufacturers:1. For new ones within and outside Europe:For some higher risk defined contries there are further prequlifcation requirements to be applied upon request by Vattenfall, such as a factory and/ or CSR-audit on production site (Corporate, Social and Responsibility audit). 2. For current ones, i.e. those already being prequalified by Vattenfall Eldistribution AB:By holding a prolonged prequalification certificate does not automatically mean further prolongation, without updated data.For this reason, also current manufacturers are urged to submit the requested information in order to be able to stay prequalified. Timeline:There is no deadline for submitting the information for prequalification s

Elektrotechnik31320000

Zeit & Verfahren

Publikation

08. Mai 2023

Abgabe

Verfahrensart

Lieferung

Erfüllungsregion

Nicht strukturiert publiziert

Im Workspace

Passt diese Ausschreibung zu Ihrem Team—und was ist jetzt zu tun?

Passung für Ihr ProfilErneuerungsradarWettbewerberAlerts & Wochenbriefing
14 Tage kostenlos testen